31

2019

-

05

How to install the monitor?


Solar street light manufacturers talk about how to install the monitor.
 
    1. When the pole, the control box, the cable bend, the linear length of the cable tube exceeds 50 meters, or the cable tubes at both ends are not 100 mm apart from each other, the hand hole must be set.
 
    2. The inner circumference of the hand hole is required to be 500 (length) × 500 (width) × 600 (deep) MM, and the gravel layer is used for water seepage; the wall of the hand hole must be smeared with cement mortar.
 
    3, the control box is equipped by the equipment manufacturer according to the required capacity, the shell is made of high-quality cold-rolled steel plate with a wall thickness of not less than 1.2mm, and the external plastic powder is sprayed and waterproof and anti-theft.
 
    4. The structural steel shall not affect the cracking, delamination, heavy leather, slag inclusion and other defects of the material and mechanical properties. The depth of the pitting or scratch shall not exceed 1/2 of the negative tolerance of the steel thickness, and shall not exceed 0.5 mm.
 
    5, design basis: design wind load: 23m / s2, fatigue life: 30 years, according to the latest national standard version of "carbon structural steel", "electrical installation engineering cable line construction and acceptance specifications", "steel structure construction and Construction of the Code of Acceptance and Regulations for the Acceptance of Construction of Reinforced Concrete Projects.